Power and renewables

Workshop Planning of switchgears in industrial networks and critical infrastructures

Workshop Planning of switching systems

Requirements for connecting switchgears - important aspects for safe and reliable network operation

The right planning of a switchgears in combination with earthing and lightning protection is of elementary importance for the safe operation of an electrical grid. Making the right decision will also ensure safe and economical operation for years to come. Some important aspects in this respect are choosing the right design and performing regular testing, e.g. of the earthing system and the external and internal lightning protection.

The objective of this workshop is a compact and practical illustration of planning fundamentals for switchgears in industrial networks and critical infrastructures. The necessity of detailed concepts for both external and internal lightning protection of electrical systems will also be discussed. We will use practical examples to give you an interesting insight into typical challenges for the planning of switchgears. 

For more information, please refer to the leaflet.

On request, DNV can also provide in-house training (content, location and duration can be adapted to you specific wishes). Please contact us for more information. 

Main topics:

  • Network connection evaluations
  • Resistance to arc interference of switchgears
  • Safety concepts
  • Short-circuit calculations
  • Design of earthing systems and potential equalisation
  • Planning criteria
  • Electromagnetic compatibility 
  • Lightning protection

Target Audience:

This workshop is aimed at engineering personnel working for industrial companies, public utilities and electricity companies who are involved in the design, development and/or operation of electrical grids.

Contact us:

Gunter Lichtenberger
Gunter Lichtenberger

Principal Engineer, Power Systems Planning

Send email

Language:

German

Duration:

2 days

The right planning of a switchgears in combination with earthing and lightning protection is of elementary importance for the safe operation of an electrical grid. Making the right decision will also ensure safe and economical operation for years to come. Some important aspects in this respect are choosing the right design and performing regular testing, e.g. of the earthing system and the external and internal lightning protection.

The objective of this workshop is a compact and practical illustration of planning fundamentals for switchgears in industrial networks and critical infrastructures. The necessity of detailed concepts for both external and internal lightning protection of electrical systems will also be discussed. We will use practical examples to give you an interesting insight into typical challenges for the planning of switchgears. 

For more information, please refer to the leaflet.

On request, DNV can also provide in-house training (content, location and duration can be adapted to you specific wishes). Please contact us for more information. 

Main topics:

  • Network connection evaluations
  • Resistance to arc interference of switchgears
  • Safety concepts
  • Short-circuit calculations
  • Design of earthing systems and potential equalisation
  • Planning criteria
  • Electromagnetic compatibility 
  • Lightning protection

Target Audience:

This workshop is aimed at engineering personnel working for industrial companies, public utilities and electricity companies who are involved in the design, development and/or operation of electrical grids.

Course planning

Date Location Language Fee Leaflet & Registration
Date
date to be determined
Location
Dresden, Germany
Language
German
Fee
EUR 650,00
Leaflet & Registration
course leaflet - not open yet